RENTAL TURNOVER — MAKE-READY SCOPE HANDOFF (BLANK TEMPLATE) Wilke Service Co. original planning worksheet | 14 November 2026 Guide: https://wilkeservices.com/resources/rental-turnover-scope-checklist This is NOT a legal move-out inspection, tenant deposit determination, rental habitability certificate, lead hazard assessment or authorization for regulated trade work. Follow your housing program, lease and local requirements. Nonidentifying unit reference (avoid tenant names/address): ______________ Authorized access / target-ready date: __________________________________ Responsible property manager / handoff owner: ____________________________ For each line mark: EVIDENCE SUPPLIED / FOLLOW-UP NEEDED / NOT CONFIRMED. These states mean available notes and work scope, NOT an independent inspection. 1. ACCESS, DATES AND AUTHORIZATION Documentation status: __________ Existing notes: _____________________________________________________ Decision / next owner: ______________________________________________ 2. WATER, ELECTRICAL AND OTHER SAFETY ISSUES Documentation status: __________ Existing notes: _____________________________________________________ Qualified-trade referral / stop-work: _______________________________ 3. WALLS, CEILINGS AND PAINTED SURFACES Documentation status: __________ Existing notes: _____________________________________________________ Building age / lead-safe renovation question: ________________________ 4. FLOORS, STAIRS AND TRANSITIONS Documentation status: __________ Existing notes: _____________________________________________________ Separate clean / repair / replace line items: ________________________ 5. KITCHEN, BATH AND FIXTURES Documentation status: __________ Existing notes: _____________________________________________________ Trade or scope boundary: ____________________________________________ 6. DEBRIS, HAUL-OUT AND FINAL CLEANING Documentation status: __________ Existing notes: _____________________________________________________ Disposal authorization / finish criterion: __________________________ 7. PHOTOS, UNFINISHED ITEMS AND FINAL HANDOFF Documentation status: __________ Existing notes: _____________________________________________________ Responsible next reviewer: __________________________________________ SCOPE EXCLUSIONS / OWNER APPROVALS NEEDED ________________________________________________________________________ ________________________________________________________________________ SAFETY: Pause unsafe work and refer wet structural materials, gas, electricity and regulated environmental hazards to qualified people. For qualifying pre-1978 U.S. rentals, paid paint-disturbing renovation may invoke EPA/state RRP. Do not paint over leaks or assume an exemption from this worksheet. HUD move-in/out form context: https://www.hud.gov/helping-americans/housing-choice-vouchers-landlord-forms EPA lead renovation rule: https://www.epa.gov/lead/lead-renovation-repair-and-painting-program FTC written estimate/contract guidance: https://consumer.ftc.gov/articles/how-avoid-home-improvement-scam Free to use worldwide. It does not determine landlord legal obligations, replace program-specific forms, create a Wilke quote or transmit private data.