Resources
Cabinet Painting Quote Checklist: Compare the Same Job
Two cabinet quotes can describe different jobs. Count the parts, name the included surfaces and put preparation, products, access and aftercare in writing.
· Wilke Service Co.
Before choosing a cabinet painter, make the proposals describe the same kitchen or bath. A price for door fronts alone cannot be compared directly with one that also includes drawer fronts, boxes, end panels, hardware and repairs. This checklist helps you ask for those differences in writing; it does not estimate a price or approve a painting method.
1. Count the parts and mark the included surfaces
- Count cabinet doors and drawer fronts separately. Photograph the full run and any island or tall units.
- Mark the boxes, face frames, exposed ends, toe kicks and trim that belong in the quote.
- State whether door backs, drawer edges, cabinet interiors and shelves are included or excluded.
- List hardware removal, labelling, storage, reinstallation and any new hardware separately.
- Identify damaged hinges, swollen panels, loose joints or missing pieces as questions for assessment, not repairs assumed to be included.
Existing material and condition matter. Solid wood, veneer and laminate should not be treated as interchangeable. Send a wider room photo and closer views of the finish, edges, greasy areas and damage. Leave an unknown material or coating marked unknown.
2. Ask for a preparation and coating specification
Ask the contractor to name the proposed cleaning and preparation, explain how the existing coating will be assessed, and identify the primer and finish where those are needed. A manufacturer's cabinet-painting example from Sherwin-Williams discusses cleaning and adhesion before the coating system. That example is not a specification for every cabinet.
- Write down the product line, finish or sheen, and approved colour or sample.
- Ask which repairs and preparation are included and which require a separate decision.
- Record whether doors stay on site or leave the property, and where the boxes will be finished.
- Ask which application method is proposed and how surrounding surfaces and adjacent rooms will be protected.
- Keep any change of product, method or included surface in the written scope.
3. Separate the work dates from return-to-use dates
Ask when doors will be removed, what can stay in the cabinets, which parts of the kitchen will be unavailable and who will reinstall and adjust the hardware. Put any proposed off-site work and the return visit in the schedule.
Also ask for separate instructions for reassembly, light use, cleaning and full cure. Benjamin Moore's cabinet-care guidance distinguishes dry paint from fully hardened paint. Follow the current instructions for the actual product; a cabinet that feels dry is not automatically ready for normal cleaning.
4. Compare exclusions and the finished handoff
- Are interiors, hardware replacement, structural repairs and water-damaged parts excluded?
- Are removal, transport, protection, cleanup and the return visit included?
- How will scope changes be priced and accepted before the extra work starts?
- What will the final walkthrough check, and how will agreed corrections be recorded?
- Will you receive the product names, colour, sheen and care instructions for later touch-ups?
Do not turn a blank line into an assumption. Ask each bidder to mark included, excluded or still to be assessed. Compare the same quantities and surfaces before treating a lower total as a lower price for the same work.
The same count can cover different work
A brief you can reuse
Use the text checklist to collect the scope, or compare two proposals side by side in the blank CSV worksheet. Use one currency and ask about taxes, allowances and exclusions before comparing totals. These files do not submit your entries. Keep addresses, access codes and private contact details out of copies shared publicly.
When you want Wilke to quote the work
Start with your city, the counts and photographs. Wilke's cabinet-painting service is quoted for the cabinets and conditions at the property. Check current service areas and confirm scope and availability before making plans. The guide is available anywhere; it is not a promise of worldwide on-site service.
Related work & service information
These guides are available worldwide. On-site work depends on your location and confirmed availability. Check service areas.
Sources
Source links and scope checked November 25, 2026. A reference to a standard does not establish which edition applies locally. Manufacturer documents apply to the products they identify.
- Sherwin-Williams — Cabinet preparation and coating exampleManufacturer example supports asking about cleaning, adhesion, primer and finish. Its named products and preparation instructions are not a universal specification.
- Benjamin Moore — Dry time, cure time and cabinet careManufacturer guidance distinguishes dry-to-touch from cure and cleaning readiness. Use the current instructions for the actual coating selected.
- U.S. EPA — Renovation, Repair and Painting: contractorsU.S. requirements can apply to paid paint-disturbing work in pre-1978 housing and child-occupied facilities. This guide does not determine applicability or establish contractor certification.
FAQ
Questions this page answers
Is a price per cabinet door enough to compare quotes?
Only if both proposals define the same work. Count doors and drawer fronts separately, then identify boxes, end panels, interiors, preparation, hardware, repairs and excluded work. A door-only figure does not describe the whole kitchen.
Does cabinet painting always mean stripping or sanding everything?
No single preparation method fits every substrate and existing coating. Ask the contractor to identify the material, assess the existing finish and name the preparation and coating system. Manufacturer instructions and an appropriate assessment control the actual work.
Can I use and clean the cabinets as soon as they feel dry?
Dry to the touch is different from fully cured. Ask for the named product's current instructions and separate guidance for reassembly, light use and cleaning. Do not assume one universal waiting period.