Refinish Hardwood Floors or Replace Them?

Compare recoating, sanding, repairs and replacement. Check the floor construction and moisture history, then prepare a brief with separate step and landing counts.

· · Wilke Service Co.

Start with the floor you have and the result you want. A tired finish, a deep scratch, an unstable board and a moisture problem need different investigations. Choosing a treatment before identifying the problem can leave the original issue unresolved.

Use this guide to prepare a useful project brief, ask better questions during an inspection and compare proposals for the same work. Readers in any country can use the decision process. Product instructions, local requirements and service availability still depend on the property. An information resource with global reach is not a promise of local service everywhere.

1. Match the treatment to the problem

A maintenance coat renews the finish after appropriate cleaning and surface preparation. Full sanding removes the existing finish and exposes wood for a new finish or colour treatment. The U.S. National Wood Flooring Association identifies deep scratches, dents and exposed bare wood as reasons to assess a floor for full sanding. Its refinishing guidance also explains that sanding suitability depends on the remaining wear layer, flatness, condition, equipment and operator.

What to investigate before choosing a floor treatment
What you observeOption to investigateWhat needs confirmation
Dullness or wear mainly in the finishCleaning and a maintenance recoatCompatibility of the existing surface and proposed coating
Scratches or wear extending into the woodSanding and refinishingEnough suitable wood remains for the sanding required
Damage concentrated in a few boardsLocal repair or board replacement, possibly with broader finishingDamage extent, replacement match and likely visual result
Instability, failed supporting construction or insufficient sanding materialRepair of the underlying system or replacementWhat failed and whether the remaining construction can be retained
New distortion after a leak or environmental changeMoisture and condition assessment firstCause, extent and stability before cosmetic work is specified

This table is a question guide, not a diagnosis from appearance alone. A recoat needs an assessment of the finish and maintenance history. Bona’s professional guidance on coating adhesion identifies inadequate preparation and remaining contaminants or maintenance products as possible causes of poor adhesion. Share the names of cleaners, oils, waxes, polishes or restoration products used on the floor, if known.

Ask for the reasoning behind the recommendation

  • What problem does the proposed treatment address?
  • Which rooms, boards and details are included?
  • What damage or variation is likely to remain visible?
  • What evidence makes the treatment suitable for this floor?
  • What findings would change the recommendation or the price?

Sanding does not guarantee that every mark disappears. ATFA’s consumer guidance on solid timber floors notes that deep cuts and stains penetrating the timber may remain after resanding. Agree on likely limitations before selecting a colour or approving the work.

2. Check construction and remaining wear layer

A visible wood pattern does not establish how much wood can be removed. An engineered board has a wood surface layer over a supporting core. Its total thickness is not the same as the remaining sandable surface. The NWFA’s technical article Refinish Your Floor explains why previous sanding, unevenness, bevels and textured surfaces matter: reaching a consistent surface may require removing more material in some areas than others.

The product matters more than a broad label. Kährs describes some of its multilayer floors as resandable while stating that its veneer constructions cannot be resanded in its guide to engineered wood construction. That manufacturer example does not establish the limit for another product. There is no dependable number of future sandings based only on a floor being called “solid” or “engineered.”

Build a product record before requesting sanding
What to recordUseful evidence
Manufacturer and productInvoice, box label, specification sheet or spare-board label
Construction and installationProduct documents, installation records or a professional’s verified finding
Previous workDates and scope of sanding, recoating or repairs, if known
Current finish and careNamed finish system and maintenance products, or mark unknown
Surface detailsPhotographs of bevels, brushing, scraping and other texture
Remaining wear layerAssessor’s measurement method, locations and stated limitations

A spare board or an already exposed edge may help identify the product. You do not need to damage the floor to prepare an initial enquiry. If construction or previous work cannot be established, record it as unknown and request an inspection. A phone photo alone cannot establish the remaining wear layer.

  • How did the assessor establish that this floor can be sanded?
  • Will the work preserve the existing bevels or texture, or change them?
  • What happens if closer inspection finds less usable material than expected?

3. Investigate moisture before cosmetic work

Wood responds to its environment. The Australasian Timber Flooring Association explains that timber takes up moisture under more humid conditions and releases it under drier conditions, with corresponding movement. Its guidance on cupping, peaking and crowning also warns that similar-looking distortion in solid and engineered floors can have different causes. A photograph of raised edges cannot identify the cause by itself.

  • When did the change first appear, and is it localised or present across several rooms?
  • Was there a leak, spill, flood, plumbing repair or other building work?
  • Did heating, cooling, ventilation or occupancy change?
  • Does the appearance change with the season?
  • What room, slab, crawlspace or other space lies below the floor?
  • Has anyone measured conditions, and are the original readings available?

Ask the assessor to distinguish air conditions, wood readings and subfloor testing in the record. Keep the material, method, instrument, units, date and location with each result. A number without that context is difficult to interpret or compare.

Do not apply one humidity or moisture limit to every product and location. Kährs’ U.S. jobsite and installation instructions specify environmental conditions and recording requirements for its products. Use the current instructions for the actual product, installation system and substrate instead of borrowing a number from an unrelated floor.

4. Compare complete scopes, not just the final price

This is Wilke’s project-planning checklist. It helps make proposals comparable; it does not mean every item belongs in every job. Send each contractor the same room list, photographs and desired outcome, then ask them to identify included work, exclusions, allowances and unresolved questions.

Define the area and the boundary of the work

Record rooms separately, using metres or feet consistently. Note closets, recesses and adjoining spaces, and mark where the work should stop. Keep approximate measurements labelled as approximate. Ask who will confirm the final billable area and how changes will be handled.

Count individual steps and landing areas separately

“One flight of stairs” leaves important details unanswered. Record the number of individual steps or treads and the number of separate landing areas. A brief reading 14 steps and 2 landings is more useful than “stairs included.”

  • Measure each landing separately and state the units.
  • Say whether risers, nosings, stringers, handrails or balustrades are included.
  • Note turns, open sides and unusual profiles.
  • Mark where stair work ends and adjoining floor work begins.
  • Photograph the whole staircase and each landing from safe, accessible positions.
Flooring quote comparison checklist
Scope itemWhat to ask the contractor to specify
PreparationFurniture, appliances, existing coverings, trim and protection of adjacent areas
RepairsIncluded boards or defects and how additional discoveries are priced
TreatmentCleaning, recoating, sanding, local repairs or replacement
Finish systemNamed products, colour, sheen and sample approval
Edges and stairsThresholds, closets, corners, individual steps, landings and transitions
Dust and cleanupContainment approach, cleanup responsibilities and waste removal
OccupancyAccess restrictions, work sequence and arrangements for occupied rooms
Return to useProduct-specific instructions for walking, furniture, rugs and normal use
PriceCurrency, taxes, allowances, exclusions and payment stages
CompletionWalk-through, care information, warranty terms and unresolved items

Ask for return-to-use instructions tied to the named finish system, rather than a general statement such as “dry tomorrow.” Keep the agreed scope, sample approval and any changes together with the quote.

Make a useful photo set

Include an overview of each room, a closer photograph of each concern, and views of doorways, transitions and stairs. A ruler or known-size reference can help describe damage. Use ordinary room lighting as well as a clear close-up. Avoid including faces, mail, identification documents or other unnecessary personal details. Give images useful names such as “living-room-overview” and “upper-landing.”

Keep the local requirements visible

Add the country, city, property type, occupancy and intended use to the brief. Ask the local contractor which product instructions, building requirements, access permissions and applicable work rules govern the proposal. Overseas technical guidance can help explain wood behaviour; it does not establish local licensing, contract, tax or building requirements.

Turn your notes into a comparable brief

Use the project worksheet below or the downloadable CSV brief to keep the property details, floor record, photo list and quote questions together. Finish with three lines: preferred proposal, reason for choosing it, and information still needed before approval.

For an available Wilke service area, hardwood sanding and refinishing and installation are scoped from the actual job. Related make-ready planning is on the rental turnover checklist. Check current service areas before requesting local work.

Free planning tool

Your project brief & quote comparison

Give each contractor the same brief, then compare what their proposals include. This worksheet does not submit your entries. Download a copy before leaving this page.

Flooring measurements, if known

Keep steps and landings separate. Describe landing sizes, winding steps, risers, rails and other details in the notes. Approximate areas need confirmation.

Changing the area unit converts the value already entered, rounded to two decimal places. Correct an invalid area before changing its unit.

Get a blank CSV template

No account or email address needed. Entries are not saved when you leave or refresh.

Related work & service information

These guides are available worldwide. On-site work depends on your location and confirmed availability. Check service areas.

Sources

Source links and scope checked November 10, 2026. A reference to a standard does not establish which edition applies locally. Manufacturer documents apply to the products they identify.

FAQ

Questions this page answers

Can every engineered floor be sanded?

No. Engineered products vary: some real-wood veneer products cannot be resanded. Identify the exact product and remaining wear layer, previous sanding, surface texture and condition. Manufacturer instructions and an appropriate inspection determine the options.

Is a screen-and-recoat the same as refinishing?

No. A recoat abrades and adds finish on top of what is still there. A full sand cuts back to wood. If the finish is worn through, stained into the wood, or deeply scratched, a recoat will not hide it.

Do you quote a price from this page?

No. Square footage, species, stain, repairs, stairs, and occupancy change the job. Send photos and the city. The quote is written from the floor, not from a website average.