Rental Turnover Checklist for Landlords & Property Managers

Walk the unit once, list what actually needs work, and quote cleaning, paint, floors, and haul-out as separate lines — not as property management.

· · Wilke Service Co.

A turnover is a deadline with a punch list hiding inside it. Walk the unit once, write down what is actually wrong, and quote the work in lines — cleaning, haul-out, paint, floors — instead of a vague “make ready.”

This checklist is general guidance for landlords and property managers. It is not legal advice, not a habitability inspection, and not property management. Wilke Service Co. quotes rental turnovers as property work. We do not advertise units, screen tenants, or collect rent. Portfolio requests can start on the landlords and property managers page.

Before anyone starts

  • Access: keys, lockbox, gate codes, and who meets the crew.
  • Utilities: water, power, and HVAC available, or say they are not.
  • Occupancy: vacant, still occupied, or a same-day move-out.
  • Ready date: the day you need it showable — not a standing 24-hour promise.
  • Photos: every room, plus anything you already know is damaged.
  • Country, location and year built: identify the applicable local requirements; U.S. pre-1978 paint rules are discussed below.

Keep one work record for each room

Record the room, existing condition, proposed work, responsible trade, access date and completion evidence. Separate cleaning from repairs and replacements so competing bids describe the same job. Photograph leaks or damp areas before cosmetic work and assign the cause for assessment or repair instead of covering the symptom.

A reusable room-by-room turnover record
FieldWhat to record
Room and conditionRoom name, dated observations and matching photo filenames
Agreed workSeparate cleaning, repair, replacement and specialist assessment lines
ResponsibilityNamed contractor or manager and any required specialist trade
Access and sequenceConfirmed access window, utilities and work that must finish first
CompletionDated result photos, walk-through decision and unresolved items

Walkthrough: what to look at

Whole unit

  • Leftover contents, trash, and anything that has to go to the dump.
  • Odors you can still smell with the windows closed.
  • Smoke and carbon-monoxide detectors present — we do not inspect or certify them; note missing or hanging units for the manager.
  • Windows, blinds, and tracks.
  • Dryer vent if a hookup exists — lint in the run is a cleaning item, not a new appliance.

Kitchen and baths

  • Appliances that stay: interiors, grease, and whether they even work. We clean; we do not repair refrigeration circuits.
  • Cabinets, drawers, and the gunk at the toe kicks.
  • Sinks, toilets, tubs, and the caulk line — cleaning versus a plumber or a recaulk.
  • Exhaust fans in baths: cover cleaning is not a duct redesign.

Walls, paint, and trim

  • Holes, crayon, grease film, and whether a wash will do or the room needs paint.
  • Doors, jambs, and baseboard that took the moving damage.
  • Cabinets that could be painted in place instead of replaced — a painting quote, not millwork.

Floors

  • Carpet: wrinkles, burns, pet spots, seams — see whether it is a repair or a replacement.
  • Hardwood: finish worn through, cupping, missing boards — refinish versus replace is its own decision.
  • Vinyl and tile: loose planks, broken grout, stained grout that will not come clean.

Outside, if it is part of the unit

  • Entry, porch, and the first impression from the sidewalk.

Typical order of work

When several trades share one vacancy window, a practical sequence is:

  • Repairs and haul-out first - debris, broken hardware, and anything that blocks paint or floors.
  • Paint next - walls and trim dry before new flooring or a final clean.
  • Flooring after paint - carpet, hardwood, LVP, or tile work so finish coats are not walked through wet.
  • Final cleaning last - so new floors and fresh paint are not covered in dust from earlier steps.

Drying time, occupied units, and utility outages can change that order. Send the ready date and photos so the quote can be honest about the window. Pet odor often rides with carpet, pad, or surface treatment - or with replacement when the pad or subfloor has taken the smell.

What Wilke can put on a quote

From the same request, when the access window allows: make-ready and move-out cleaning, cleanouts and haul-off of ordinary debris, interior paint, carpet cleaning and repair, hardwood sanding and refinishing, vinyl or other flooring replacement, tile and grout, odor treatment, dryer-vent cleaning, windows, and light exterior washing. Each line is optional. Biohazard, asbestos, mold remediation, and regulated waste are not offered.

Related reading: refinish or replace hardwood, and repair or replace carpet.

United States: check pre-1978 paint requirements

Paid renovation work that disturbs painted or coated surfaces in qualifying housing built before 1978 can trigger EPA’s Renovation, Repair and Painting (RRP) requirements, subject to applicable rules and exemptions. A wood appearance alone does not establish an exemption: confirm whether the work will disturb paint or another regulated surface coating. Wilke does not publicly claim RRP certification. Regulated RRP work is not undertaken without whatever certification or exemption is required. If the building is pre-1978 and the job will disturb paint or coating, say so on the quote request.

Start with the EPA’s current Renovation, Repair and Painting program guidance. It explains that the general owner-occupier exception does not automatically apply when a home is rented out. Confirm the applicable federal, state or Tribal program before commissioning regulated work. The EPA’s testing guidance explains how determinations about regulated surface coatings must be made.

Check the rules where the property is

This checklist organises work; it does not certify a rental as legally compliant worldwide. The examples below point to local authorities rather than applying one country’s rules to every property.

  • England: GOV.UK’s private-rental repair guidance describes landlord responsibilities for areas including the structure, heating and wiring, and directs readers to different housing procedures where applicable.
  • New Zealand: Tenancy Services’ healthy homes standards overview covers heating, insulation, ventilation, moisture ingress and drainage, and draught stopping, with defined exemptions.
  • Elsewhere: identify the authority for the property’s country and local area, then confirm the requirements and permitted contractors for the actual work.

Close out the work before handover

  • Walk through each room against the agreed scope, with dated completion and defect photographs.
  • Route unresolved appliance, electrical, gas, plumbing or other specialist concerns to the appropriate qualified trade.
  • Confirm that keys and access devices have been returned and agreed access has ended.
  • Save product instructions, care information and warranty documents.
  • Record every open item with a responsible person and next date instead of describing the whole unit as complete.

When different trades are being quoted, use the free rental turnover scope handoff to document unresolved hazards, paint and floor decisions, and follow-up responsibility without storing tenant data on this site.

Free planning tool

Your project brief & quote comparison

Give each contractor the same brief, then compare what their proposals include. This worksheet does not submit your entries. Download a copy before leaving this page.

Get a blank CSV template

No account or email address needed. Entries are not saved when you leave or refresh.

Related work & service information

These guides are available worldwide. On-site work depends on your location and confirmed availability. Check service areas.

Sources

Source links and scope checked November 10, 2026. A reference to a standard does not establish which edition applies locally. Manufacturer documents apply to the products they identify.

FAQ

Questions this page answers

Does a turnover quote include leasing or tenant screening?

No. This is property work: cleaning, haul-out, paint, floors, and related make-ready lines. We do not advertise units, place tenants, or collect rent.

Can you guarantee a 24-hour make-ready?

A ready date needs to match the actual scope, access, trade availability and product drying or curing times. Give the contractor photos and a record of what remains in the unit. For Wilke work, location, capacity and timing must be confirmed before scheduling.

United States: what if the house was built before 1978?

In the United States, paid renovation work that disturbs painted or coated surfaces in qualifying pre-1978 housing can trigger EPA’s RRP requirements, subject to applicable rules and exemptions. A wood appearance alone does not establish an exemption: confirm whether the work will disturb paint or another regulated surface coating. Wilke does not publicly claim RRP certification. Ask on the quote request so regulated work can be handled under whatever certification or exemption is required.

In what order should turnover work happen?

A practical sequence is repairs and haul-out first, then paint, then flooring, with final cleaning last. Access, drying time, and the punch list can change that order. Send the ready date with photos so the quote matches the window.

Can pet odor be handled on a turnover?

Often as a make-ready line when the odor is in carpet, pad, or surfaces we can treat or replace. If the pad or subfloor has taken the smell, replacement may be the honest line. Heavy biohazard and mold remediation are not offered.