Rental Turnover Scope Checklist & Free Make-Ready Handoff
Turn scattered make-ready notes into a clear, private handoff: what was observed, what's still unknown and which trade should handle each item.
· Wilke Service Co.
A vacant unit may need paint, a floor repair, debris removal and a final clean — but those are different work orders. The most useful make-ready scope shows what is known, what still needs checking, and who should handle each line. This page helps assemble that handoff from existing notes without inventing measurements or prices.
This is not a legally sufficient move-out inspection or a judgment about a tenant's deposit. HUD offers a move-in/move-out condition form as a separate record used in certain housing contexts. Owner/tenant rights and safety duties vary by location. Keep those obligations separate from the repair work described here.
Decide whether the next step is safe before sorting a quote
A leaking wall, suspected mold, faulty electrical work, gas hazard or unstable structure is not an extra paint line. Pause unsafe work and refer it to an appropriately qualified trade. A repair estimate should not quietly promise remediation, testing or licensing that the bidder has not established.
Ask the building-age question before disturbing paint
In qualifying pre-1978 U.S. rental housing, paid renovation that disturbs painted surfaces may trigger the EPA Renovation, Repair and Painting (RRP) Rule or an authorized state program. The rule includes specified exemptions and different responsibilities for landlords, contractors and owner-occupants. Check the actual rule and hire an appropriately lead-safe certified firm when required. This worksheet does not inspect paint or establish an exemption.
Turn a vague "make ready" into useful line items
- Access and timing: confirm authority to enter and the ready date, without putting resident data into this tool.
- Safety and moisture: flag water, gas, structural or electrical questions for qualified evaluation before cosmetic work.
- Walls and paint: separate patching, surface preparation and painting from lead-safe or other regulated tasks.
- Floors: distinguish carpet cleaning, stretching, patching, hardwood refinishing and material replacement. Do not cover a wet substrate.
- Fixtures: separate ordinary cleaning from leaks, failed fittings or locally licensed-trade repairs.
- Haul-out and final cleaning: list only authorized discard items and the actual final-clean scope.
- Final record: list unfinished matters, photo references, who receives the handoff and which items require a second visit.
Related decisions can be narrowed further with our carpet repair guide, hardwood refinish-or-replace guide, and step-by-step turnover walkthrough.
Compare a written quote without inventing an average price
The FTC recommends written estimates and checking contractors' qualifications. A useful quote says which work is included, what materials are expected, an estimated start and completion window, and how changes are approved. Do not assume the lowest number includes debris disposal, stairs, damaged underlayment or a second final clean. Those are scope questions to resolve before signing.
Download the blank text template if you need a printable starting point. The private browser tool below helps you flag seven categories and export a plain-text handoff. It does not accept uploads, create a legal move-out record or submit a quote.
Useful anywhere; service is local
Anyone may use this planning template. Wilke Service Co. offers region-dependent property work through its rental turnover services. It does not provide tenant screening, leasing or certification merely because a worksheet is complete. Outside its coverage, use a suitably qualified local company.
How this page was prepared: an original make-ready scope aid based on publicly available HUD, EPA and FTC guidance listed below, checked November 14, 2026. This is not legal advice, a licensed inspection or a report of work performed at a particular rental.
Free field notes · Works on this device
Build a clearer handoff, without guessing.
Compare the notes and photos you already have. Mark missing evidence as unconfirmed—not a completed inspection. Make a text record for the responsible operator or property manager.
0 of 7 topics marked with evidence or follow-up
Safety before paperwork
Stop and refer suspected electrical, gas, sewage, structural, moisture, asbestos or lead-paint hazards. For pre-1978 U.S. rental housing, paid paint-disturbing renovation may require lead-safe certified firms and practices under applicable EPA/state RRP rules.
Do not enter credentials, tenant information, customer names, or private records. The worksheet does not submit or save data. Copying and downloading happen only when you choose them.
A label to help you recognize the record. Leave it blank if it could identify an occupant or customer.
Access, dates and authorization
Is possession/entry authorization established and the target ready date recorded?
Ask next: Confirm access, permission and scheduling with the property owner/manager.
Water, electrical and other safety issues
Have suspected leaks, wet areas and safety hazards been flagged for the appropriate trade?
Ask next: Pause unsafe work and obtain qualified assessment before cosmetic fixes.
Walls, ceilings and painted surfaces
Are patch/paint needs described, including potential pre-1978 paint disturbance?
Ask next: Confirm build year and lead-safe renovation obligations before disturbing paint.
Floors, stairs and transitions
Is the difference between cleaning, stretching, refinishing, repair and replacement recorded?
Ask next: Separate treatments and quantities in the quote; check substrate moisture first.
Kitchen, bath and fixtures
Are cleaning issues separated from leaks, failed fixtures and specialist repairs?
Ask next: Refer licensed-trade items as locally required and avoid concealment by paint or caulk.
Debris, haul-out and final cleaning
Have disposal responsibility, authorized items and final-clean scope been specified?
Ask next: Confirm what may be discarded; protect belongings and hazardous materials.
Photos, unfinished items and final handoff
Can someone tell what was finished, what needs rechecking and who owns the next step?
Ask next: Record exceptions and final walkthrough decisions rather than claiming a pass.
Related work & service information
These guides are available worldwide. On-site work depends on your location and confirmed availability. Check service areas.
Sources
Source links and scope checked November 14, 2026. A reference to a standard does not establish which edition applies locally. Manufacturer documents apply to the products they identify.
- HUD — Move-in and move-out inspection exampleOfficial housing-program resource explains recording room conditions; its own form is not a substitute for an applicable program inspection or local law.
- EPA — Lead Renovation, Repair and Painting ProgramOfficial U.S. guidance on paid paint-disturbing work in pre-1978 housing and qualifying facilities, including states administering their own RRP programs.
- FTC — How to avoid a home-improvement scamConsumer guidance supports checking contractors and agreeing a written work scope; it does not determine prices or licensing for a specific jurisdiction.
FAQ
Questions this page answers
Is this a legal move-out or habitability inspection?
No. The worksheet helps communicate a work scope. Owner/tenant inspection rights, security deposits, habitability obligations and required professional inspections depend on local law and applicable housing programs.
What if a rental was built before 1978?
In the United States, paid paint-disturbing work in qualifying pre-1978 housing may fall under EPA or authorized state lead-safe renovation rules. Verify the specific coverage and use a properly qualified firm when required.
Should cleaning or paint conceal a leak or electrical issue?
No. Flag water, structural, gas and electrical concerns for appropriate qualified assessment before cosmetic work. The worksheet is a planning aid, not permission to enter unsafe spaces.
Does this tool store tenant or property records?
No. It keeps entries in the current page until you choose to copy or save text locally. Avoid tenant names, contact details, addresses, health information and other private records.